PCB Board Drilling Machine(CNC Process Center) Maintenance Guideline

PCB board drilling machine maintenance, also apply to routing machine.

Daily Maintenance

Maintenance before/after machine run daily

ItemMaintenance PartMaintenance requirement
1 Appearance All in clean situation. Debur it if not smooth
2 Spindle/Tool Cassette In clean situation. Make sure spindle run at lower speed for at least 10 minutes.
3 Tool, tool set All required specification in place, stainless, check screw is tight
4 Computer Appearance is clean, sort the document, clean the recycling station in computer. Name the document should include title,version, time, operator etc.
5 Electric Cabin Clean and no dust
6 Lubricant oil Check the oil can level, lubricant device in good condition
7 Cooling liquid No leak and block
8 Air pipe and air gun No leak and flow fluently
9 Tooling box/tooling table Keep inner/outside clean, tooling in place, no rust
10 Shelf Clean, sorted and no rust

PCB board drilling machine maintenance, also apply to routing machine.

First Level Maintenance(weekly)

Weekly maintenance be done by night shift team(per the team on duty in turn), duration is about one hour.

First cut off the power supply, then follow the below steps

Item Maintenance Part Maintenance Requirement
1AppearanceClean inside and outside of the machine, no rust, clean the worktable, check the flat and debur. Lubricant it.
2Spindle/Tool CassetteClean the cassette, clean the spindle with soft cloth. Clean and lubricant the collet
3Tool/tool protectionClean and sorted, no rust,check screw is tight
4ComputerClean the computer and sorted the cables.
5Electric CabinClean and no dust
6Lubricant oilCheck the oil can level, lubricant device in good condition
7Cooling LiquidNo leak and block
8Tooling box/tooling tableKeep inner/outside clean, tooling in place, no rust
9ShelfClean, sorted and no rust

PCB board drilling machine maintenance, also apply to routing machine.

Second level maintenance(monthly)

Monthly maintenance be done by day shift team(per the team on duty in turn), repair staff include.

First cut off the power supply, then follow the below steps, and make the spare parts lists, duration is about 1.5 hours.

Item Maintenance Part Maintenance Requirement
1 Appearance Clean the machine and top cover. no rust, clean the worktable, check the flat and debur. Lubricant it.
2 Spindle/cassette Clean the cassette, clean the spindle with soft cloth. Clean and lubricant the collet
3 Guide rail Remove the guide rail cover, clean the piling near the guide rail, lubricant it. Check the limit switch, make sure in working condition.
4 Tool/tool protection Clean and sorted, no rust,check screw is tight
5 Computer Clean the computer and sorted the cables.Update the antivirus software
6 Electric Cabin Clean and no dust. Clean the filter of the back door fan
7 Lubricant oil Check the oil can level, lubricant device in good condition
8 Cooling liquid No leak and block
9 Tooling box/tooling table Keep inner/outside clean, tooling in place, no rust
10 Shelf Clean, sorted and no rust